Find A Project

Steel Sheet Pile Walls

Location: Calcasieu
Category: Bulkheads
Lanier performed the engineering design and construction management for this new lay barge and spool base facility.  This project included 3300 L.F. of steel sheetpile bulkhead, mooring dolphins, breasting dolphins, 170,000 S.F. of articulated concrete revetment mattress, 1,000,000 cubic yard of dredging and all civil site work..

Sheet Pile Walls

Location: Calcasieu River
Category: Bulkheads
Lanier performed the engineering design and construction management for this new lay barge and spool base facility.  This project included 3300 L.F. of steel sheetpile bulkhead.  

Steel Sheet Pile Walls

Location: Houston Ship Channel. Seabrook, TX
Category: Bulkheads
This is an expansion to existing facility which will include a new ship dock and two new barge docks.  Project includes 1,000 L.F. of steel sheetpile bulkhead, 40,000 square foot of revetment,  and 600,000 cubic yards of dredging.  Lanier provided the engineering design and construction management.

Barge Cleaning Facility

Location: Mississippi River
Category: Vapor Control
Lanier & Associates provided engineering and construction management for this barge cleaning facility on the Mississippi River. This project included design of a floating barge dock with monopiles, with approach way, elevated pump house, and a marine vapor control system.

Vapor Safety skid

Location: Neches River
Category: Vapor Control
Lanier & Associates proved the design of the safety skid on this loading platform. The system was designed by Lanier & Associates for 20,000 BBL/hr crude loading rate.

Ship/Barge Dock and Vapor Control

Location: Neches River
Category: Vapor Control
Aerial view of ship dock and U.S. Coast Guard certified Marine Vapor Control System where Lanier & Associates provided the engineering design and cost managment. The dock was designed for SPR and can offload crude oil at 50,000 BBL/hr and load through the VC equipment at 20,000 BBL/hr. 100,000 DWT ships can be accommodated.

Vapor Control Flare Stacks

Location: Neches River
Category: Vapor Control
View of concrete approach ramp leading to ship loading platform with pipe rack to left and marine vapor control enclosed flare stacks in the background.  Lanier & Associates provided all engineering design for the marine facility and vapor control system. 

Ship/Barge Dock and Vapor Control System

Location: Corpus Christi, TX
Category: Vapor Control
Lanier & Associates provided the engineering design and construction management for the Marine Vapor Control System at docks 1 & 2, and mechanical, electrical and structural engineering for the tank farm expansion.

Barge Dock and Vapor Control

Location: Corpus Christi, TX
Category: Vapor Control
Lanier and Associates provided mechanical, electrical and structural design for the marine vapor control system and all of the top-side dock equipment including the marine loading arms, platform, and piping.

Hydro Survey Boat

Location:
Category: Surveying
Surveying is an important part of every project.  Unfortunately it is often overlooked and treated as a formality.  A properly developed survey program can help set the direction of a project and it can confirm the accuracy of engineering and drafting data.  Lanier & Associates is experienced in all facets of surveying work including: Topographic Hydrographic Construction Layout Right-of-way Alignment Monitoring Railroad Layout Automated Surveys The following equipment and instruments are maintained in-house by Lanier: Automatic Levels Land Based RTK GPS Total Station with Data Collectors Boat with Recording Fathometer Integrated with GPS  (Global Positioning System) Pipe Locations Survey Vehicles CAD Work Stations with Surveying Software