Find A Project

Ship Dock Hose Tower

Location: Refinery Terminal Wharf, Texas City Refinery, Texas City, Tx.
Category: Marine Liquid Terminals
Lanier & Associates provided Engineering and Construction for this ship/barge Dock No. 32 including the hose tower. This project also included the monopile ship breasting dolphins as well as barge dolphins.

Island Ship Jetty

Location: Fuel Oil and Bunkering Pier, St. Eustatius, Netherlands Antilles, Caribbean Sea
Category: Marine Liquid Terminals
Lanier & Associates has provided engineering services at this island terminal for more than 25 years.  This photo is a view of a 1/2 mile long finger pier with berths for up to 150,000 DWT vessels. The pier handles fuel oil and blended grades of ship’s bunkers. The vessel shown is approaching the South berth.

Ship/Barge Dock

Location: Calcasieu River, Lake Charles, LA
Category: Marine Liquid Terminals
Lanier performed engineering design and construction management to replace existing dock. This project involved the total replacement of both a high capacity ship dock and multipurpose barge dock.

Ship/Barge Dock

Location: Calcasieu River
Category: Marine Liquid Terminals
Lanier & Associates provided preliminary and detail engineering for the upgrade/expansion at this marine terminal.  The project included a new pipe rack, new electrical distribution system, new ship dock #3 and barge docks designed and built to receive up to eight barges at one time.  Lanier also provided construction management.

Ship/Barge Dock

Location: Houston Ship Channel, Houston, TX
Category: Marine Liquid Terminals
Lanier & Associates provided complete multidiscipline engineering services in connection with the development of new Ship/Barge Dock number 4.  One challenging aspect of this large project was the detailed engineering design and construction support for the 1,500 linear foot steel sheet pile bulkhead located on the Houston ship channel. 

Ship/Barge Dock

Location: Mississippi River
Category: Marine Liquid Terminals
Lanier & Associates provided the permitting, preliminary and detailed engineering design, project management and bid phase services for this new ship and barge dock.  This project included all structural, electrical, and mechanical engineering for the pipe racks, approach, loading arms, and all top side equipment.  

Ship/Barge Dock

Location: Mississippi River
Category: Marine Liquid Terminals
Lanier & Associates provided permitting, structural, mechanical, electrical engineering and construction management for this new floating ship/barge dock project.  This project included new pipe racks, approach, loading arms, and all topside equipment to the new floating barge. 

Ship/Barge Dock

Location: Houston Ship Channel
Category: Marine Liquid Terminals
Lanier & Associates provided  permitting, construction management, mechanical, electrical and structural engineering design for the expansion to existing facility which includes a new ship dock and two new barge docks.  Some design details of the project are 1,000 L.F. of steel sheet pile bulkhead, 600,000 cubic yards of dredging, mono-piles and mooring dolphin. 

Floating Ship/Barge Dock

Location: Mississippi River
Category: Marine Liquid Terminals
Lanier & Associates provided engineering design, permitting and construction management for the new floating Ship/Barge Dock #1 at this Mississippi River terminal.  Engineering included all structural, mechanical and electrical for this project.  It also included design of hose towers, approach, pipe rack and all topside equipment.

Marine Vapor Control

Location: Corpus Christi, TX
Category: Marine Liquid Terminals
Lanier & Associates provided the engineering design and construction management for the Marine Vapor Control System at docks 1 & 2, and mechanical, electrical and structural engineering for the tank farm expansion.